MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.
Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025., This news data comes from:http://www.erlvyiwan.com
Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.

Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.
"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
- An AI simulation of a Mount Fuji eruption is being used to prepare Tokyo for the worst
- Immigration: 1st lookout bulletin in effect on 35 individuals, including Discayas, linked to anomalous flood control projects
- Makati distributes Blu Card cash aid
- Vico Sotto could challenge VP Sara in 2028 race – survey
- Roxas matriarch Judy Araneta-Roxas, 91
- Plea written in blood saves Chinese woman trapped in locked room
- Boy killed, mother injured in Pasig fire
- DILG to roll out nationwide unified 911 hotline on Sept. 11
- Harold Cabreros takes post as new OCD chief
- US senators to reinforce 'partnership' with Taiwan